Bathroom
installations.
A full, finished bathroom. Not a plumber passing the tiler a dozen problems on the way out.
The works
Everything that goes into the room — done by us.
Most "bathroom installers" sub-contract half the job. We do it ourselves: the first-fix pipework, the wall build-outs, the plastering, the tiling and grouting, the fitting, the electrics that fit in with our remit, and every seal and silicone bead that keeps it watertight. That's why the finish hangs together.
- Strip-out and safe disposal, floors protected
- First-fix plumbing, pipe rerouting, soil stack work
- Plastering, skimming, Venetian and micro-cement finishes
- Large-format tiling & natural stone, mitred edges
- Second-fix fitting: baths, basins, brassware, screens
- LED niches, backlit mirrors, heated towel rails
"Ripped out, re-piped, re-plastered and re-born. The tile work alone was worth it."







